Skip to content

EDI/25/03486/FUL

Land 230 Metres East Of 134 Muir Wood Road Currie Edinburgh

Application GrantedWorth watchingPublic Realm & Community Projects
Planning document
1 / 5
Received

3 July 2025

Validated

3 July 2025

Planning signals

7 detected traits

Works
Landscaping
Context
Change Of Use
Specific
Drainage Wastewater InfrastructureEcologyExternal LightingPedestrian Infrastructure
AI summary

Hard-surfacing and widening the field path linking Juniper Green and Currie, with low-level lighting, benches, filter-drainage and planting to formalise the route as a permanent public link. .

Impact scale

Estimated scale of impact on the surrounding area.

4/10
DISCUSSIONNo comments yet

City Scope · Planning application

Application EDI/25/03486/FUL

Land 230 Metres East Of 134 Muir Wood Road Currie Edinburgh

Reference
EDI/25/03486/FUL
Address
Land 230 Metres East Of 134 Muir Wood Road Currie Edinburgh
Status
Application Granted
Category
Public Realm & Community Projects
Impact scale
4/10
Authority
The City of Edinburgh Council
Received
Validated
Last checked
Added to City Scope

How do I track planning application EDI/25/03486/FUL?

Follow it on City Scope. This page is checked against the City of Edinburgh Council planning register and shows the latest status, decision and documents for EDI/25/03486/FUL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the City of Edinburgh Council planning portal.

Plain-language summary

Hard-surfacing and widening the field path linking Juniper Green and Currie, with low-level lighting, benches, filter-drainage and planting to formalise the route as a permanent public link. .

As filed with the council

Upgrading an informal path through and agricultural field and changing it's use to a permanent surfaced public path. The path will be 2m wide minimum at pinch points along the route and widened out to 2.5m. There will be uplighters to delineate the route. Benches are proposed to provide rest stops. Surface water will be managed by cross drainage discharging into filter trenches. Low level planting to the south of the proposed path will be used to separate the field from the path.