Planning applicationEDI/17/05564/VAR2

Former Water Board Site Buckstone Terrace Edinburgh

Awaiting AssessmentRoof Works & Dormers
Planning document
Received

18 May 2026

Validated

18 May 2026

Planning Signals

1 detected trait

Works
Facade / Exterior
Application Insights

No form insights available yet.

AI summary

Roof repairs could be swapped for a full slate replacement, keeping the same height, pitch and finish, with existing slates reused where possible.

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/17/05564/VAR2

Former Water Board Site Buckstone Terrace Edinburgh

Awaiting AssessmentRoof Works & DormersReceived Local authority

Roof repairs could be swapped for a full slate replacement, keeping the same height, pitch and finish, with existing slates reused where possible.

Reference
EDI/17/05564/VAR2
Address
Former Water Board Site Buckstone Terrace Edinburgh
Status
Awaiting Assessment
Category
Roof Works & Dormers
Impact scale
3/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.9055228
Longitude
-3.2080046

Plain-language summary

Roof repairs could be swapped for a full slate replacement, keeping the same height, pitch and finish, with existing slates reused where possible.

As filed with the council

Non Material Variation - The original consent proposes the existing roof to be retained and repaired. Due to structural limitations, this is not practical and the applicant seeks to vary the application to instead replace the existing slate roof. The proposed new slate roof will match the heights, pitch and finish of the existing slate roof. Existing roof slates are to be carefully removed and re-installed where possible.