Planning applicationEDI/19/00986/VAR6

Western Harbour Western Harbour Drive Edinburgh

Permission has been variedExternal Lighting & Fixtures
Planning document
1 / 4
Received

8 August 2025

Validated

8 August 2025

Planning Signals

4 detected traits

Works
Facade / ExteriorRoof Works
Specific
Drainage Wastewater InfrastructureNon Material Variation
Application Insights

No form insights available yet.

AI summary

Switches rainwater pipes to black PVC and adds extra downpipes on Blocks 1-3 at Western Harbour Plot P1 to suit revised drainage needs. .

Impact scale

Estimated scale of impact on the surrounding area.

2/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/19/00986/VAR6

Western Harbour Western Harbour Drive Edinburgh

Permission has been variedExternal Lighting & FixturesReceived Local authority

Switches rainwater pipes to black PVC and adds extra downpipes on Blocks 1-3 at Western Harbour Plot P1 to suit revised drainage needs. .

Reference
EDI/19/00986/VAR6
Address
Western Harbour Western Harbour Drive Edinburgh
Status
Permission has been varied
Category
External Lighting & Fixtures
Impact scale
2/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.980265
Longitude
-3.1814218

Plain-language summary

Switches rainwater pipes to black PVC and adds extra downpipes on Blocks 1-3 at Western Harbour Plot P1 to suit revised drainage needs. .

As filed with the council

A supporting document outlining the nature of all proposed amendments is attached to this application under the following reference: 124-7N-NMV Design Update Summary. Description of proposed amendments: 1. Amendment to material of rainwater downpipes from metal to PVC to match CEC specification and maintenance preferences. All rainwater downpipes to be MWK-04, black colour. 2. Additional rainwater downpipes for Block 1 and Block 3 flat roofs (East and West Elevations) and Block 2 street elevation as result of revised drainage calculations.