Minor tweaks to approved residential scheme: repositioned cycle stores, refined surfacing and courtyard layout, adjusted stair/bin link, retains more landscaping.

Status: Permission has been variedCategory: Legal / AdministrativeReceived: 5 February 2026

Core Details

Reference
20/02562/VAR4
Address
Northfield House Hotel 115 Lasswade Road Edinburgh EH16 6UD
Status
Permission has been varied
Category
Legal / Administrative
Impact Scale
2/10

Timeline

Received
5 February 2026
Validated
6 February 2026
Last Scraped
18 February 2026
Record Created
18 February 2026

Application Summary

AI Summary

Minor tweaks to approved residential scheme: repositioned cycle stores, refined surfacing and courtyard layout, adjusted stair/bin link, retains more landscaping.

Original Description

Non-Material Variation. Please note that, following a Change of Use, the site now falls under the category Class 8, Residential. This application for variation is for the following: 1. Cycle Parking. 2. Surface Finishes + Layout. 3. Stair + Bin Store Relationship. 4. Retention + Courtyard Rationalisation.

Related Applications (5)

  • 20/02562/VAR3Permission has been varied(9 September 2025)

    Swap metallic cladding on Level 03 for dark-grey smooth render to ease long-term upkeep. .

  • 25/04190/FULApplication Granted(14 August 2025)

    Student block on Lasswade Rd could be repurposed as temporary Class 8(a) housing, largely retaining its current layout. .

  • 25/03360/FULApplication Withdrawn(27 June 2025)

    Purpose-built student block on Lasswade Rd would switch to Class 8a temporary residential use; no structural or external changes proposed. .

  • 25/01446/CLPApplication Refused(19 March 2025)

    Internal reconfiguration adds two extra bedrooms within the existing dwelling; no change to footprint, height, or external appearance. .

  • 20/02562/VAR2Permission has been varied(17 February 2025)

    Enlarges lower courtyard, shifts access route, adds plant equipment and revises external materialsno new buildings, just modest adjustments to the existing design.