Planning applicationEDI/23/03649/VAR2

525 Ferry Road Edinburgh EH5 2DW

Awaiting AssessmentLegal / Administrative
Planning document
1 / 4
Received

24 February 2026

Validated

26 February 2026

Planning Signals

12 detected traits

Works
Facade / ExteriorRoof WorksInternal Alterations
Specific
BalconyBasement ConversionBuild To Rent
Application Insights

No form insights available yet.

AI summary

Revised Park View scheme swaps Block E to build-to-rent, trims one storey, tweaks flat mix, facades, balconies and basement, adds PVs, and removes a stair core.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/23/03649/VAR2

525 Ferry Road Edinburgh EH5 2DW

Awaiting AssessmentLegal / AdministrativeReceived Local authority

Revised Park View scheme swaps Block E to build-to-rent, trims one storey, tweaks flat mix, facades, balconies and basement, adds PVs, and removes a stair core.

Reference
EDI/23/03649/VAR2
Address
525 Ferry Road Edinburgh EH5 2DW
Status
Awaiting Assessment
Category
Legal / Administrative
Impact scale
7/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.9680426
Longitude
-3.233053

Plain-language summary

Revised Park View scheme swaps Block E to build-to-rent, trims one storey, tweaks flat mix, facades, balconies and basement, adds PVs, and removes a stair core.

As filed with the council

Non Material Variation to Planning Consent 23/03649/FUL.A non-material variation is sought for the following: 1.Block E has changed from Private for Sale to Build To Rent. This results in a 1 storey reduction, a change to the accommodation mix and amendments to the elevations 2.Internal apartment layouts have been developed to suit the affordable and BTR providers requirement as well as the private for sale market 3.The central stair core from Block E has been removed 4.Minor facade changes have been made to align with the internal layouts 5.The basement structure has been rationalised to make it more efficient for construction and operation 6.Blocks A-D - mid-floor banding has changed from a pressed metal banding to a pre-cast stringcourse 7.Balcony sizes have been rationalised across all blocks as well as the metalwork detail 8.PVs have been added to the Block E&F roof to meet Building Standards The changes are described within the accompanying Non-material Variation statement. A full drawing submission and register has also been included.