Planning applicationEDI/25/00166/LBC

Scottish National Portrait Gallery 1 Queen Street Edinburgh EH2 1JD

Application GrantedWindows, Doors & Glazing
Planning document
1 / 5
Received

14 January 2025

Validated

14 January 2025

Planning Signals

3 detected traits

Works
Internal Alterations
Context
Listed Building
Specific
Leisure Culture
Application Insights

No form insights available yet.

AI summary

Second-phase internal upgrade swaps 33 timber fire doorsincluding flush, panelled and semi-glazed setsfor compliant like-for-like units in line with Dec 2024 fire strategy. .

Impact scale

Estimated scale of impact on the surrounding area.

2/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/25/00166/LBC

Scottish National Portrait Gallery 1 Queen Street Edinburgh EH2 1JD

Application GrantedWindows, Doors & GlazingReceived Local authority

Second-phase internal upgrade swaps 33 timber fire doorsincluding flush, panelled and semi-glazed setsfor compliant like-for-like units in line with Dec 2024 fire strategy. .

Reference
EDI/25/00166/LBC
Address
Scottish National Portrait Gallery 1 Queen Street Edinburgh EH2 1JD
Status
Application Granted
Category
Windows, Doors & Glazing
Impact scale
2/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.9554654
Longitude
-3.1935919

Plain-language summary

Second-phase internal upgrade swaps 33 timber fire doorsincluding flush, panelled and semi-glazed setsfor compliant like-for-like units in line with Dec 2024 fire strategy. .

As filed with the council

Replacement like for like of 3 No. modern timber flush doors (including 1 No. double door set), 16 No. timber panelled doors (including 3 No. double door sets), and 14 No. timber semi glazed doors (including 12 No. double door sets) to meet current fire standards and in line with the fire strategy recommendations / report that was carried out in December 2024. This is phase 2 of works, phase 1 is already complete however, separate LBC was submitted for phase one and was deemed not required.