Planning application · EDI/25/03863/FUL
Two external meeting pods at the Lyell Centre.
Lyell Building, British Geological Survey Research Avenue South Riccarton Currie
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Outbuildings & Ancillary Structures
- Minor 2/10
- External Works
- Landscaping
- Meeting Space
- Retrospective
Overview
- Today
- Additional meeting space; the work is recorded as completed.
- Proposed
- Two external meeting pods within a landscaped area to the rear of the Lyell Centre.
- Size
- 9 m² proposed non-residential floorspace · 9 m² site area
- Stage
- Past its target date of 25 Sept 2025.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks planning permission for two external meeting pods in a landscaped area behind the Lyell Centre. The work was completed on 20/01/2023; the record describes the application as retrospective, meaning it seeks permission for work already carried out. The form says the existing use is additional meeting space and gives 9 square metres of proposed non-residential floorspace.
Written with AI from the application form and the council record.
Keep reading
Track this application
How do I track planning application EDI/25/03863/FUL?
Follow it on City Scope. This page is checked against the City of Edinburgh Council planning register and shows the latest status, decision and documents for EDI/25/03863/FUL. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the City of Edinburgh Council planning portal.
On the street
What neighbours would notice.
- 01
Two external meeting pods are located in a landscaped area to the rear of the Lyell Centre.
Questions
Has the work already happened?
Yes. The form says it was completed on 20/01/2023.
What does retrospective mean here?
The application seeks permission for work that has already been carried out.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Landscaping
- External Works
- Meeting Space
- Retrospective
What each tag is based on
- External Works
- “on a new slab”, “linked by a short gravel path”
- Landscaping
- “within a landscaped area”, “linked by a short gravel path”
- Meeting Space
- “external meeting pods”
- Retrospective
- “in retrospect”
All documents (5)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received25 Jul 2025
- Validated25 Jul 2025The council has everything it needs.
- Comments closed15 Aug 2025Usual deadline. Late comments may still count.
- Target decision (next)25 Sept 20252-month target for local developments.
- DecisionNot yet
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- EDI/25/03863/FUL
- Address
- Lyell Building, British Geological Survey Research Avenue South Riccarton Currie
- Status
- Not Development-Permission Not Required
- Category
- Outbuildings & Ancillary Structures
- Impact scale
- 2/10
- Authority
- The City of Edinburgh Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.




