Planning application
25/04048/LBC
Edinburgh Hindu Mandir And Cultural Centre 2 St Andrew Place Edinburgh EH6 7EG
Roof PV panels, discreet air-to-air heat pumps, a flagpole, new signage and safety handrails proposed to update the Mandir building with greener kit and clearer access. .
Status: Application GrantedCategory: Renewable Energy, EV & Heat PumpsReceived: 6 August 2025
Core Details
- Reference
- 25/04048/LBC
- Address
- Edinburgh Hindu Mandir And Cultural Centre 2 St Andrew Place Edinburgh EH6 7EG
- Status
- Application Granted
- Category
- Renewable Energy, EV & Heat Pumps
- Impact Scale
- 2/10
Timeline
- Received
- 6 August 2025
- Validated
- 7 August 2025
- Last Scraped
- 28 September 2025
- Record Created
- 13 August 2025
Application Summary
AI Summary
Roof PV panels, discreet air-to-air heat pumps, a flagpole, new signage and safety handrails proposed to update the Mandir building with greener kit and clearer access. .
Original Description
Installation of air to air heat pumps, flag pole, signage, handrails and photovoltaic panels.
Related Applications (1)
New fascia sign above entrance and small rooftop flagpole displaying mandir emblem at St Andrews Place. .