Planning applicationEDI/25/04778/FUL

1F 1 Oxford Terrace Edinburgh EH4 1PX

Not Development-Permission Not RequiredInternal Works & Accessibility
Planning document
1 / 4
Received

11 September 2025

Validated

11 September 2025

Planning Signals

6 detected traits

Works
Windows & Doors
Specific
Cellar UpgradeFireplace Alteration RestorationFlatListed Building Consent ContextSanitary Accommodation
Application Insights

No form insights available yet.

AI summary

Revamps sash windows, reinstates period-style glazing, reconfigures layout for new kitchen, master suite, utility and upgraded vault cellars plus new fireplace.

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/25/04778/FUL

1F 1 Oxford Terrace Edinburgh EH4 1PX

Not Development-Permission Not RequiredInternal Works & AccessibilityReceived Local authority

Revamps sash windows, reinstates period-style glazing, reconfigures layout for new kitchen, master suite, utility and upgraded vault cellars plus new fireplace.

Reference
EDI/25/04778/FUL
Address
1F 1 Oxford Terrace Edinburgh EH4 1PX
Status
Not Development-Permission Not Required
Category
Internal Works & Accessibility
Impact scale
3/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.9554773
Longitude
-3.2160305

Plain-language summary

Revamps sash windows, reinstates period-style glazing, reconfigures layout for new kitchen, master suite, utility and upgraded vault cellars plus new fireplace.

As filed with the council

Refurbish existing sash & case windows /shutters. Create new master bathroom /kitchen /new utility room /new dressing room /en-suite for master bedroom /new floor finishes to rooms. New fireplace replacing non-original fireplace. Replace non-original glazing in entrance hall. Replace internal oriel window /reintroduction internal glazing above new bathroom door. Existing dado rails /wall panels removed from master bedroom. Upgrading existing under pavement cellars (as amended).