Planning applicationEDI/25/05244/FUL

11 Melville Crescent Edinburgh EH3 7LU

Not Development-Permission Not RequiredMechanical Plant, Flues & Ventilation
Planning document
1 / 5
Received

2 October 2025

Validated

14 October 2025

Planning Signals

1 detected trait

Works
Windows & Doors
Application Insights

No form insights available yet.

AI summary

Listed townhouse facelift: repairing stonework, railings and windows, adding louvres, CCTV, EV chargers, new AC and extract fans, plus safer external ramp. .

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/25/05244/FUL

11 Melville Crescent Edinburgh EH3 7LU

Not Development-Permission Not RequiredMechanical Plant, Flues & VentilationReceived Local authority

Listed townhouse facelift: repairing stonework, railings and windows, adding louvres, CCTV, EV chargers, new AC and extract fans, plus safer external ramp. .

Reference
EDI/25/05244/FUL
Address
11 Melville Crescent Edinburgh EH3 7LU
Status
Not Development-Permission Not Required
Category
Mechanical Plant, Flues & Ventilation
Impact scale
3/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.9493285
Longitude
-3.2138832

Plain-language summary

Listed townhouse facelift: repairing stonework, railings and windows, adding louvres, CCTV, EV chargers, new AC and extract fans, plus safer external ramp. .

As filed with the council

Minor repairing / refurbishing of front / rear elevations, including cast iron railings / windows / external metal ramp. Installation of new CCTV cameras/new video phone intercom system to front / rear elevations. Installation of 2 No. new louvres at top sections of lower ground floor windows in front elevation. Replacement of lower ground floor window cills / external door in front elevation. Installation of 2 No. new wall mounted EV charging units in rear of buildings stone wall. Replacement of floor standing condensing units to new at rear of building. Installation of new louvre on rear ground floor stone wall and rear first floor stone wall. Installation of new extract fan to existing sash window on first floor kitchen area and third floor kitchen area. Replacement of existing extract fan on third floor cleaner store area. Installation of new anti slip tread to external ramp