Planning applicationEDI/25/05969/LBC

Telecoms Apparatus 12 Metres Northwest Of 2 Cables Wynd House Cables Wynd North Leith Edinburgh

Permission Is Not RequiredTelecommunications
Planning document
1 / 3
Received

12 November 2025

Validated

12 November 2025

Planning Signals

4 detected traits

Context
Listed Building
Specific
Associated InfrastructureElectrical InfrastructureTelecoms
Application Insights

No form insights available yet.

AI summary

New fibre cable run from ground duct through risers to 8th-floor comms room, adding a building flexibility point en route. .

Impact scale

Estimated scale of impact on the surrounding area.

2/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/25/05969/LBC

Telecoms Apparatus 12 Metres Northwest Of 2 Cables Wynd House Cables Wynd North Leith Edinburgh

Permission Is Not RequiredTelecommunicationsReceived Local authority

New fibre cable run from ground duct through risers to 8th-floor comms room, adding a building flexibility point en route. .

Reference
EDI/25/05969/LBC
Address
Telecoms Apparatus 12 Metres Northwest Of 2 Cables Wynd House Cables Wynd North Leith Edinburgh
Status
Permission Is Not Required
Category
Telecommunications
Impact scale
2/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.97416920000001
Longitude
-3.1735282

Plain-language summary

New fibre cable run from ground duct through risers to 8th-floor comms room, adding a building flexibility point en route. .

As filed with the council

Install new fibre cable from existing duct upturn, following the route of existing apparatus, where it will enter the risers on 1st floor with the installation of a new BFP and then the cable will run up the risers to 8th floor comms room.