Planning application

25/06088/CLP

David Hume Tower 40 George Square Southside Edinburgh EH8 9LL

Install tensioned stainless-steel mesh over listed towers slate cladding to secure loose slates and windows, safeguarding main elevations without full rebuild. .

Status: Application RefusedCategory: Roof Works & DormersReceived: 19 November 2025

Core Details

Reference
25/06088/CLP
Address
David Hume Tower 40 George Square Southside Edinburgh EH8 9LL
Status
Application Refused
Category
Roof Works & Dormers
Impact Scale
5/10

Timeline

Received
19 November 2025
Validated
25 November 2025
Last Scraped
26 November 2025
Record Created
26 November 2025

Application Summary

AI Summary

Install tensioned stainless-steel mesh over listed towers slate cladding to secure loose slates and windows, safeguarding main elevations without full rebuild. .

Original Description

Proposals for 40 George Square with the focus shifting to stabilisation and consolidation of the facade for health & safety reasons. We are currently in early stages of exploring options for this which includes a light gauge stainless steel open mesh system offering robust protection against slate failure. This would be tension tight to the slate and windows to secure the fabric and would cover the principle elevations.

Related Applications (3)

  • 25/06565/FULApplication Granted(17 December 2025)

    Lightweight stainless-steel mesh proposed to wrap 40 George Squares faade, securing and consolidating the existing cladding without altering massing. .

  • 25/06568/LBCApplication Granted(17 December 2025)

    Stainless steel mesh secured around 40 George Squares frame to stabilise loose cladding and protect passers-by ahead of fuller facade works. .

  • 25/02469/LBCPermission Is Not Required(13 May 2025)

    Level-13 staff kitchen receives a like-for-like timber door with twin vision panels; frame and surrounding fabric remain untouched.

Supporting Documents (4)