Planning application25/06518/VARY

Land 25 Metres South Of Greendykes House 14 Greendykes Road Edinburgh

Permission has been variedMechanical Plant, Flues & Ventilation
Planning document
1 / 3
Received

13 May 2026

Validated

13 May 2026

Planning Signals

4 detected traits

Specific
Ancillary StructureDrainage Wastewater InfrastructureExternal WorksMechanical Plant
Application Insights

No form insights available yet.

AI summary

A small layout change could move the external pump room and raise a buried manhole to slab level inside the enclosure, avoiding service clashes.

Impact scale

Estimated scale of impact on the surrounding area.

2/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application 25/06518/VARY

Land 25 Metres South Of Greendykes House 14 Greendykes Road Edinburgh

Permission has been variedMechanical Plant, Flues & VentilationReceived Local authority

A small layout change could move the external pump room and raise a buried manhole to slab level inside the enclosure, avoiding service clashes.

Reference
25/06518/VARY
Address
Land 25 Metres South Of Greendykes House 14 Greendykes Road Edinburgh
Status
Permission has been varied
Category
Mechanical Plant, Flues & Ventilation
Impact scale
2/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.9273649
Longitude
-3.1235501

Plain-language summary

A small layout change could move the external pump room and raise a buried manhole to slab level inside the enclosure, avoiding service clashes.

As filed with the council

Non Material Variation - Pump Room Relocation + Manhole Mitigation. The new external pump room location revised due to existing underground services identified during site investigation. During setting out of the revised location, a manhole was discovered buried approximately 600mm below existing ground level, which falls within the footprint of the proposed slab. Now propose to extend the existing manhole shaft up to the new finished slab level, with the manhole housing contained within the GRP enclosure.