Front elevations timber sash windows to be repainted Farrow & Ball Green Smoke, matching side/rear; setback and wall keep street impact low.

Status: Application ApprovedCategory: Windows, Doors & GlazingReceived: 27 January 2026

Core Details

Reference
26/00321/WINPA
Address
12 Hope Terrace Morningside Edinburgh EH9 2AR
Status
Application Approved
Category
Windows, Doors & Glazing
Impact Scale
1/10

Timeline

Received
27 January 2026
Validated
29 January 2026
Last Scraped
3 February 2026
Record Created
3 February 2026

Application Summary

AI Summary

Front elevations timber sash windows to be repainted Farrow & Ball Green Smoke, matching side/rear; setback and wall keep street impact low.

Original Description

We intend on painting the side & rear timber sash + case windows a green colour, which does not require planning permission as per The EoECs guidance Quick Guide to Windows dated 2024. We would also like to paint the front elevation windows the same green colour (Farrow & Balls Green Smoke) for continuity, which we feel is acceptable due to the building being set back from the road and given there is a large site boundary wall to Hope Terrace, which provides screening and means there would be little to no impact to the street. This application is therefore requesting approval to paint the front elevation windows & frames, as noted above.

Related Applications (3)

  • 25/04676/FULApplication Granted(8 September 2025)

    DOFF steam treatment would clean stone walls, porch, plinths and chimney, removing graffiti, algae and stains while retaining the houses original masonry. .

  • 25/04430/FULApplication Granted(27 August 2025)

    Enlarged metal-clad masonry porch replaces existing, adding natural-stone plinth, wider steps and an accessible entry. .

  • 24/00798/VARYPermission has been varied(22 August 2025)

    Minor tweaks to approved house plan: two dormers dropped, materials altered, rooflight moved, pool and garage trimmed, lift and balustrades removed, heat pumps shifted. .