Planning application
26/01551/LBC
3 Hillside Crescent Hillside Edinburgh EH7 5DY
A second-floor cupboard could become a compact WC with basin, with minor internal alterations and a new drainage link to existing pipework.
Status: Permission Is Not RequiredCategory: Internal Works & AccessibilityReceived: 13 April 2026
Core Details
- Reference
- 26/01551/LBC
- Address
- 3 Hillside Crescent Hillside Edinburgh EH7 5DY
- Status
- Permission Is Not Required
- Category
- Internal Works & Accessibility
- Impact Scale
- 2/10
Timeline
- Received
- Validated
- Last Scraped
- Record Created
Additional Application Data
- Latitude
- 55.9580524
- Longitude
- -3.1806852
Application Summary
AI Summary
A second-floor cupboard could become a compact WC with basin, with minor internal alterations and a new drainage link to existing pipework.
Original Description
Install WC and wash hand basin in existing cupboard. New drainage to connect internally to existing drainage branch in ceiling void below.