Planning application · EDI/26/01578/PA
Railway bridge repairs and a new handrail proposed on Westfield Road.
Railway Bridge Westfield Road Slateford Edinburgh
Free preview. First month free, then £1 a month. Cancel any time.
Preview alerts near your postcode
- Parking, Access & Highways
- Medium 5/10
- Facade / Exterior
- Bridge Context
- Bridge Safety
- Drainage Wastewater Infrastructure
- Heritage Masonry Repairs
Overview
- Proposed
- Renewed timber deck, drainage and waterproofing; new handrail; repairs to steelwork and masonry
- Stage
- Decided: Application Approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application describes repairs to the railway bridge, including renewing its timber deck, waterproofing and repairing steelwork and masonry. It also proposes a new handrail and painting new steelwork and the bridge’s outer faces to match the existing colour scheme. The application is approved.
Written with AI from the application form and the council record.
Keep reading
Track this application
How do I track planning application EDI/26/01578/PA?
Follow it on City Scope. This page is checked against the City of Edinburgh Council planning register and shows the latest status, decision and documents for EDI/26/01578/PA. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the City of Edinburgh Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The timber bridge deck would be renewed, with drainage and waterproofing work.
- 02
A new handrail would be installed as an edge protection system.
- 03
Steelwork and masonry would be repaired, and new steelwork and the bridge’s outer faces painted to match the existing colour scheme.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Facade / Exterior
- Bridge Context
- Bridge Safety
- Drainage Wastewater Infrastructure
- Heritage Masonry Repairs
What each tag is based on
- Facade / Exterior
- “painting to all new steelwork”, “Condition-led repairs to steelwork and masonry”
- Bridge Context
- “"Railway Bridge Westfield Road"”, “"Westfield Road rail bridge"”
- Bridge Safety
- “"Installation of new edge protection system (a new handrail)"”, “"Railway Bridge Westfield Road"”
- Drainage Wastewater Infrastructure
- “back of wall drainage”, “drainage and waterproofing upgrades”
- Heritage Masonry Repairs
- “"Condition-led repairs to steelwork and masonry"”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received14 Apr 2026
- Validated14 Apr 2026The council has everything it needs.
- Comments closed5 May 2026Usual deadline. Late comments may still count.
- Target decision14 Jun 20262-month target for local developments.
- DecisionApplication Approved
The record
- Reference
- EDI/26/01578/PA
- Address
- Railway Bridge Westfield Road Slateford Edinburgh
- Status
- Application Approved
- Category
- Parking, Access & Highways
- Impact scale
- 5/10
- Authority
- The City of Edinburgh Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.