Planning application26/02053/LBC

22 Ainslie Place Edinburgh EH3 6AJ

Awaiting AssessmentRenewable Energy & Sustainability
Planning document
1 / 4
Received

12 May 2026

Validated

2 June 2026

Planning Signals

4 detected traits

Works
Windows & DoorsInternal Alterations
Context
Listed Building
Specific
Cupola Glazing
Application Insights

No form insights available yet.

AI summary

Ainslie Place townhouse plans could open up internal rooms, add glazed screens below the cupola, and introduce solar panels, a heat pump and battery storage.

Impact scale

Estimated scale of impact on the surrounding area.

4/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application 26/02053/LBC

22 Ainslie Place Edinburgh EH3 6AJ

Awaiting AssessmentRenewable Energy, EV & Heat PumpsReceived Local authority

Ainslie Place townhouse plans could open up internal rooms, add glazed screens below the cupola, and introduce solar panels, a heat pump and battery storage.

Reference
26/02053/LBC
Address
22 Ainslie Place Edinburgh EH3 6AJ
Status
Awaiting Assessment
Category
Renewable Energy, EV & Heat Pumps
Impact scale
4/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.953539
Longitude
-3.20926

Plain-language summary

Ainslie Place townhouse plans could open up internal rooms, add glazed screens below the cupola, and introduce solar panels, a heat pump and battery storage.

As filed with the council

Form opening in ground floor internal wall and install double doorset. Close pocket doorset in first floor internal wall. Form openings for and install glazed screens to stair void wall below cupola. Install photovoltaic array, air-source heat pump and battery storage.