Planning applicationEDI/26/02309/LBC

3F2 15 Leopold Place Edinburgh EH7 5LB

Permission Is Not RequiredInternal Works & Accessibility
Planning document
1 / 4
Received

29 May 2026

Validated

29 May 2026

Planning Signals

3 detected traits

Context
Listed Building
Specific
Electrical InfrastructureFlat
Application Insights

No form insights available yet.

AI summary

A modest power upgrade is proposed for the flats, largely along existing cable routes, with some stairwell drilling and a new shared distribution board.

Impact scale

Estimated scale of impact on the surrounding area.

2/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/26/02309/LBC

3F2 15 Leopold Place Edinburgh EH7 5LB

Permission Is Not RequiredInternal Works & AccessibilityReceived Local authority

A modest power upgrade is proposed for the flats, largely along existing cable routes, with some stairwell drilling and a new shared distribution board.

Reference
EDI/26/02309/LBC
Address
3F2 15 Leopold Place Edinburgh EH7 5LB
Status
Permission Is Not Required
Category
Internal Works & Accessibility
Impact scale
2/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.958067
Longitude
-3.181468

Plain-language summary

A modest power upgrade is proposed for the flats, largely along existing cable routes, with some stairwell drilling and a new shared distribution board.

As filed with the council

Electricity supply to building needs to be replaced. SP Energy Networks have advised that "cables for all the flats will follow the existing routes of the current cables", however some drilling within the common stairwell may be required. These works will involve the introduction of a new Distribution Board within the common stair area. Contractors on behalf of SP Energy Networks will make good any ways made with white multi-purpose filler for walls and ceilings and Cement for between floors.