Planning application
26/02493/CLP
108 Holyrood Road Edinburgh EH8 8AS
Barclay House could get a new boiler and flue, with matching anodised aluminium cladding and metal copes replacing roof-level finishes.
Status: Awaiting AssessmentCategory: Mechanical Plant, Flues & VentilationReceived: 11 June 2026
Core Details
- Reference
- 26/02493/CLP
- Address
- 108 Holyrood Road Edinburgh EH8 8AS
- Status
- Awaiting Assessment
- Category
- Mechanical Plant, Flues & Ventilation
- Impact Scale
- 4/10
Timeline
- Received
- Validated
- Last Scraped
- Record Created
Additional Application Data
- Latitude
- 55.950489
- Longitude
- -3.176257
Application Summary
AI Summary
Barclay House could get a new boiler and flue, with matching anodised aluminium cladding and metal copes replacing roof-level finishes.
Original Description
Replace existing boiler and form new flue. Replace existing rainscreen cladding, primarily at roof level, with a like for like colour/finish of anodized aluminium. Over clad existing stone copes with metal copes in same anodized colour.