Planning application26/02770/LBC

BF, GF, 1F, 2F, 3F 9 Moray Place Edinburgh EH3 6DS

Permission Is Not RequiredInternal Works & Accessibility
Planning document
1 / 3
Received

1 July 2026

Validated

15 July 2026

Planning Signals

3 detected traits

Context
Listed Building
Specific
Electrical Capacity UpgradeElectrical Infrastructure
Application Insights

No form insights available yet.

AI summary

Communal stair areas could get new trunking, cabling and a distribution board to modernise power supplies to the flats.

Impact scale

Estimated scale of impact on the surrounding area.

2/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application 26/02770/LBC

BF, GF, 1F, 2F, 3F 9 Moray Place Edinburgh EH3 6DS

Permission Is Not RequiredInternal Works & AccessibilityReceived Local authority

Communal stair areas could get new trunking, cabling and a distribution board to modernise power supplies to the flats.

Reference
26/02770/LBC
Address
BF, GF, 1F, 2F, 3F 9 Moray Place Edinburgh EH3 6DS
Status
Permission Is Not Required
Category
Internal Works & Accessibility
Impact scale
2/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.955221
Longitude
-3.207247

Plain-language summary

Communal stair areas could get new trunking, cabling and a distribution board to modernise power supplies to the flats.

As filed with the council

SPEN mains upgrade is required to modernise the electrical supplies into all the flats in the building. Metal trunking to be installed to the communal area of the stairs, with cables passing through the landings to the flats. A new distribution board will be installed at the point of supply, feeding an individual cable for each flat with a new fuse installed in each property connected to the existing meter. There may be a requirement for a white PVC trunking to contain the cable.