Planning applicationEDI/26/03003/FUL

104 George Street Edinburgh EH2 3DF

Awaiting AssessmentInternal Works & Accessibility
Planning document
1 / 3
Received

20 July 2026

Validated

20 July 2026

Planning Signals

4 detected traits

Specific
AtmBankExternal AlterationsShopfront
Application Insights

No form insights available yet.

AI summary

Refurbishment of the existing Lloyds bank at basement and ground-floor levels, with upgraded internal and external ATMs and a like-for-like street ATM.

Impact scale

Estimated scale of impact on the surrounding area.

4/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/26/03003/FUL

104 George Street Edinburgh EH2 3DF

Awaiting AssessmentInternal Works & AccessibilityReceived The City of Edinburgh Council

Refurbishment of the existing Lloyds bank at basement and ground-floor levels, with upgraded internal and external ATMs and a like-for-like street ATM.

Reference
EDI/26/03003/FUL
Address
104 George Street Edinburgh EH2 3DF
Status
Awaiting Assessment
Category
Internal Works & Accessibility
Impact scale
4/10
Authority
The City of Edinburgh Council
Received
Validated
Last scraped
Record created
Latitude
55.9523
Longitude
-3.2031

Plain-language summary

Refurbishment of the existing Lloyds bank at basement and ground-floor levels, with upgraded internal and external ATMs and a like-for-like street ATM.

As filed with the council

Refurbishment of the existing bank at basement and ground floor levels, including replacement of internal and external ATMs. replacement of existing street-front ATM within the existing frontage on a like-for-like basis.