Proposed internal structural works at The Real Mary King's Close would replace temporary propping with glass ceiling panels and supporting steelwork.
The record
- Reference
- EDI/26/03169/LBC
- Address
- 2 Warriston's Close Old Town Edinburgh EH1 1PG
- Status
- Awaiting Assessment
- Category
- Internal Works & Accessibility
- Impact scale
- 4/10
- Authority
- Local authority
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 55.950108
- Longitude
- -3.190673
What is proposed
Plain-language summary
Proposed internal structural works at The Real Mary King's Close would replace temporary propping with glass ceiling panels and supporting steelwork.
As filed with the council
Replace the existing temporary propping to install a series of structural glass panels beneath the ceilings to support the plaster directly, with a steel frame installed beneath the panels to carry the load