Planning applicationABC/251344/DPP

Ground To The West Of Science Teaching Hub University Of Aberdeen Bedford Road Aberdeen AB24 3LG

ApprovedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,000 of 1,158 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 158 records from that period are still being added or checked.

Proposals and decisions come from Aberdeen City Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

12 December 2025

Validated

12 December 2025

Planning Signals

4 detected traits

Specific
Ancillary StructureBoreholePedestrian InfrastructureRenewable Energy Infrastructure
Application Insights

No form insights available yet.

AI summary

Two geothermal monitoring boreholes, surface equipment cabinets and new footpaths are proposed for the Aberdeen Geothermal Feasibility Pilot near St Machar.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABC/251344/DPP

Ground To The West Of Science Teaching Hub University Of Aberdeen Bedford Road Aberdeen AB24 3LG

ApprovedRenewable Energy, EV & Heat PumpsReceived Aberdeen City Council

Two geothermal monitoring boreholes, surface equipment cabinets and new footpaths are proposed for the Aberdeen Geothermal Feasibility Pilot near St Machar.

Reference
ABC/251344/DPP
Address
Ground To The West Of Science Teaching Hub University Of Aberdeen Bedford Road Aberdeen AB24 3LG
Status
Approved
Category
Renewable Energy, EV & Heat Pumps
Impact scale
5/10
Authority
Aberdeen City Council
Received
Validated
Last scraped
Record created
Latitude
57.1665
Longitude
-2.106

Plain-language summary

Two geothermal monitoring boreholes, surface equipment cabinets and new footpaths are proposed for the Aberdeen Geothermal Feasibility Pilot near St Machar.

As filed with the council

Formation of two monitoring boreholes (approximately 500m and 1000m deep), installation of monitoring equipment cabinets at ground level and formation of footpaths as part of Aberdeen Geothermal Feasibility Pilot