Skip to content

Planning application · ABS/APP/2025/1015

ABS/APP/2025/1015DecidedWorth watching

49.9MW battery storage system proposed at Fairfield, Inverurie.

Land At Fairfield Inverurie AB51 5BL

West Garioch ward · Aberdeenshire Council

Preview alerts near this site

Free preview. £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
Renewable Energy, EV & Heat Pumps
Scale
Large 7/10
Tags
  • Associated Infrastructure

Overview

Why it’s worth watching

A 49.9MW battery energy storage system with associated infrastructure is proposed on land at Fairfield, Inverurie, representing significant energy infrastructure.

Proposed
A battery energy storage system with an installed capacity of 49.9MW and associated infrastructure.
Size
49.9 MW installed capacity
Stage
Decided on 25 Feb 2026: Refused.

The council writes only to properties within 20 metres of an application site. Who is told

In plain English

The application proposes a battery energy storage system with an installed capacity of 49.9MW and associated infrastructure at land at Fairfield, Inverurie.

Written with AI from the application form and the council record.

Keep reading

Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

Track this application

How do I track planning application ABS/APP/2025/1015?

Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2025/1015. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.

Set up a planning alert