Planning applicationABS/APP/2025/1152

Land At Middleton Of Blackford Rothienorman AB51 8YN

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

15 July 2025

Validated

15 July 2025

Planning Signals

2 detected traits

Specific
Section 36 ConsentSubstation
AI summary

Proposed battery storage (up to 500MW) with solar panels, substation and grid infrastructure at a rural site.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/APP/2025/1152

Land At Middleton Of Blackford Rothienorman AB51 8YN

DecidedRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Proposed battery storage (up to 500MW) with solar panels, substation and grid infrastructure at a rural site.

Reference
ABS/APP/2025/1152
Address
Land At Middleton Of Blackford Rothienorman AB51 8YN
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.403489
Longitude
-2.521719

Plain-language summary

Proposed battery storage (up to 500MW) with solar panels, substation and grid infrastructure at a rural site.

As filed with the council

Consultation under Section 36 of the Electricity Act 1989 for the Installation of Battery Energy Storage System (BESS) with an Installed Capacity of up to 500MW, Solar PV Panels and Associated Substation and Infrastructure