Application ABS/APP/2025/1152
Land At Middleton Of Blackford Rothienorman AB51 8YN
Proposed battery storage (up to 500MW) with solar panels, substation and grid infrastructure at a rural site.
The record
- Reference
- ABS/APP/2025/1152
- Address
- Land At Middleton Of Blackford Rothienorman AB51 8YN
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.403489
- Longitude
- -2.521719
What is proposed
Plain-language summary
Proposed battery storage (up to 500MW) with solar panels, substation and grid infrastructure at a rural site.
As filed with the council
Consultation under Section 36 of the Electricity Act 1989 for the Installation of Battery Energy Storage System (BESS) with an Installed Capacity of up to 500MW, Solar PV Panels and Associated Substation and Infrastructure