Planning application · ABS/APP/2025/1248
Solar array and battery storage of up to 90MW proposed south of Kintore.
2km South Of Kintore Aberdeenshire AB51 0XH
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
- Section 36 Consent
- Solar Farm
Overview
Why it’s worth watching
A 90MW solar and battery storage installation is major energy infrastructure with significant land-use and grid implications.
- Proposed
- Solar PV array and battery energy storage system with capacity of up to 90MW, plus associated infrastructure.
- Stage
- Council responded on 20 Mar 2026: No Objection.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for a solar photovoltaic (PV) array and battery energy storage system (BESS), with capacity of up to 90MW, and associated infrastructure. It is a consultation under Section 36 of the Electricity Act 1989.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2025/1248?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2025/1248. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A solar PV array and battery energy storage system are proposed 2km south of Kintore.
Tags
- Associated Infrastructure
- Section 36 Consent
- Solar Farm
What each tag is based on
- Associated Infrastructure
- “and Associated Infrastructure”
- Section 36 Consent
- “Section 36 of the Electricity Act 1989”
- Solar Farm
- “Kintore Solar Farm”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 20 March 2026.
- Received30 Jul 2025
- Validated30 Jul 2025The council has everything it needs.
- Comments closed20 Aug 2025Usual deadline. Late comments may still count.
- Target decision30 Sept 20252-month target for local developments.
- Decision20 Mar 2026No Objection.
The record
- Reference
- ABS/APP/2025/1248
- Address
- 2km South Of Kintore Aberdeenshire AB51 0XH
- Status
- Decided
- Council decision
- No Objection
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- East Garioch
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.