Two temporary access junctions proposed off the C5B.
Land Off The C5B To The East Of The Bothy Newton Of Rora Longside Peterhead AB42 4UR
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Parking, Access & Highways
- Small 4/10
- Temporary Access
Overview
- Today
- Agricultural land, according to the application form.
- Proposed
- Two temporary access junctions off the C5B.
- Size
- 4,500 m² site area · 3 -4 years temporary period
- Stage
- Decided on 19 Nov 2025: Approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes two temporary access junctions from the C5B for construction vehicles accessing the cable corridor for the LT360 Spittal to Peterhead High Voltage Cable project. The junctions would be needed for 3-4 years, until the underground cable is installed and commissioned. The application is marked as decided, but the record does not give the decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2025/1279?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2025/1279. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Two temporary access junctions would be built off the C5B for construction vehicles.
- 02
The access junctions are described as temporary, for 3-4 years while the underground cable is installed and commissioned.
Questions
What are the junctions for?
They would provide construction vehicles with access to the cable corridor for the LT360 Spittal to Peterhead High Voltage Cable project.
Where would they be?
The form locates them off the C5B, 630m west of Rora Dairy.
Has a decision been made?
The record says the application is decided, but does not state the decision.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Temporary Access
What each tag is based on
- Temporary Access
- “Formation of 2 Temporary Access Junctions”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 19 November 2025.
- Received4 Aug 2025
- Validated6 Aug 2025The council has everything it needs.
- Comments closed27 Aug 2025Usual deadline. Late comments may still count.
- Target decision6 Oct 20252-month target for local developments.
- Decision19 Nov 2025Approved.
The record
- Reference
- ABS/APP/2025/1279
- Address
- Land Off The C5B To The East Of The Bothy Newton Of Rora Longside Peterhead AB42 4UR
- Status
- Decided
- Council decision
- Approved
- Decision issued
- Category
- Parking, Access & Highways
- Impact scale
- 4/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Peterhead North and Rattray
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.