Planning application · ABS/APP/2025/1280
Temporary access junction proposed off the C43B for cable works.
Land Off The C43B To The North East Of The Junction With The A950 Flushing Longside Aberdeenshire AB42 4XS
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Parking, Access & Highways
- Small 4/10
- Temporary Access
Overview
- Today
- The form describes the current or most recent use as construction of two temporary access junctions off the C43B for the cable project.
- Proposed
- A temporary access junction off the C43B for construction vehicles accessing the cable corridor.
- Size
- 2,500 m² site area · 3 -4 years proposed duration
- Stage
- Decided on 18 Nov 2025: Approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for a temporary access junction off the C43B, 65m north-east of its junction with the A950. It would provide construction vehicles with access to the cable corridor for the LT360 Spittal to Peterhead High Voltage Cable project. The form says the junction would be needed for 3-4 years, until the underground cable is installed and commissioned.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2025/1280?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2025/1280. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A temporary access junction would be formed off the C43B, 65m north-east of the junction with the A950.
- 02
Construction vehicles would use the access to reach the cable corridor.
Questions
Why is the access junction proposed?
It would provide access to the cable corridor for construction vehicles working on the LT360 Spittal to Peterhead High Voltage Cable project.
How long would it be needed?
The form says it would be required for 3-4 years, until installation of the underground cable is complete and commissioned.
Has the work started?
The application form says the work had not started or been completed.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Temporary Access
What each tag is based on
- Temporary Access
- “Formation of Temporary Access Junction”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 18 November 2025.
- Received4 Aug 2025
- Validated6 Aug 2025The council has everything it needs.
- Comments closed27 Aug 2025Usual deadline. Late comments may still count.
- Target decision6 Oct 20252-month target for local developments.
- Decision18 Nov 2025Approved.
The record
- Reference
- ABS/APP/2025/1280
- Address
- Land Off The C43B To The North East Of The Junction With The A950 Flushing Longside Aberdeenshire AB42 4XS
- Status
- Decided
- Council decision
- Approved
- Decision issued
- Category
- Parking, Access & Highways
- Impact scale
- 4/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Central Buchan
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.