Planning application · ABS/APP/2025/1563
Application seeks changes to noise conditions for Clashindarroch II Wind Farm.
Clashindarroch Wind Farm Gartly Huntly
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Condition Non Compliance General
- Section 36 Consent
- Wind Turbine
Overview
Why it’s worth watching
Proposed variation of noise conditions for an existing wind farm is a material change to an established infrastructure consent with clear local consequence.
- Today
- The site is mainly commercial forestry, with areas of open moorland and ancient woodland.
- Proposed
- Changes to the operational noise conditions for the approved wind farm; no physical works are described.
- Size
- 1,234 ha site area
- Stage
- Decided on 23 Dec 2025: Approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This application seeks to vary conditions 34 and 36 of the approved Clashindarroch II Wind Farm scheme, reference APP/2020/0049. The conditions relate to operational noise limits for the wind turbines. The application record says it has been decided, but gives no decision outcome.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2025/1563?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2025/1563. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertThe impact
What the application says.
Questions
What do the conditions cover?
They set operational noise limits for the wind turbines.
What decision was made?
The record marks the application as decided but does not state the decision outcome.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Condition Non Compliance General
- Section 36 Consent
- Wind Turbine
What each tag is based on
- Condition Non Compliance General
- “Without Compliance with Conditions 34 and 36 (Noise)”
- Section 36 Consent
- “Section 36”, “Energy Consents Unit Reference: ECU00002002”
- Wind Turbine
- “Clashindarroch Wind Farm”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 23 December 2025.
- Received19 Sept 2025
- Validated30 Sept 2025The council has everything it needs.
- Comments closed21 Oct 2025Usual deadline. Late comments may still count.
- Target decision30 Jan 20264-month target for major developments.
- Decision23 Dec 2025Approved.
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
The record
- Reference
- ABS/APP/2025/1563
- Address
- Clashindarroch Wind Farm Gartly Huntly
- Status
- Decided
- Council decision
- Approved
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.