Potable water borehole proposed at Fetteresso Substation.
Fetteresso Substation Fetteresso Stonehaven Aberdeenshire
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Mechanical Plant, Flues & Ventilation
- Medium 5/10
- Ancillary Structure
- Associated Infrastructure
- Borehole
Overview
- Today
- An electrical substation with a control room and associated electrical infrastructure.
- Proposed
- A potable water borehole and associated infrastructure for the control building's water supply.
- Size
- 0.11 ha site area
- Stage
- Decided on 6 Feb 2026: Approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks permission to install a borehole and associated infrastructure to supply water to the existing Fetteresso Substation Control Building. The form says the supply would be private, not connected to the public water network. The application is marked as decided, but the record does not give the decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2025/1920?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2025/1920. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertThe impact
What the application says.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Ancillary Structure
- Associated Infrastructure
- Borehole
What each tag is based on
- Ancillary Structure
- “with a small kiosk”
- Associated Infrastructure
- “associated underground pipework”
- Borehole
- “Installation of Potable Water Borehole”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 6 February 2026.
- Received24 Nov 2025
- Validated17 Dec 2025The council has everything it needs.
- Comments closed7 Jan 2026Usual deadline. Late comments may still count.
- Target decision17 Feb 20262-month target for local developments.
- Decision6 Feb 2026Approved.
The record
- Reference
- ABS/APP/2025/1920
- Address
- Fetteresso Substation Fetteresso Stonehaven Aberdeenshire
- Status
- Decided
- Council decision
- Approved
- Decision issued
- Category
- Mechanical Plant, Flues & Ventilation
- Impact scale
- 5/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.