CityScope · Planning Updates
Application ABS/APP/2025/1930
Land Between Maryhill And Greens New Deer Turriff Aberdeenshire AB53 6XT And AB53 5YQ
Proposed onshore grid connection for Caledonia Offshore Wind Farm via underground cabling and associated works, with ecological and landscape mitigation.
The record
- Reference
- ABS/APP/2025/1930
- Address
- Land Between Maryhill And Greens New Deer Turriff Aberdeenshire AB53 6XT And AB53 5YQ
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Aberdeenshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.5043
- Longitude
- -2.2833
What is proposed
Plain-language summary
Proposed onshore grid connection for Caledonia Offshore Wind Farm via underground cabling and associated works, with ecological and landscape mitigation.
As filed with the council
Onshore Transmission Infrastructure for Caledonia Offshore Wind Farm including Laying of Underground Cables and Associated Works to connect to the Transmission Grid