Planning application · ABS/APP/2026/0348
Two replacement wind turbines proposed at Auchorrie Farm.
Auchorrie Farm Midmar Aberdeenshire AB51 7NL
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 2
Overview
Why it’s worth watching
Two 76.5m-tall wind turbines at a named farm is a substantive renewable-energy development with clear local landscape and infrastructure implications.
- Today
- An existing wind farm and agricultural land, including two turbines with a tip height of 45.5 metres and a hub height of 32 metres.
- Proposed
- Replace the two existing turbines with two 800kW turbines, with a tip height of 76.5 metres and a hub height of 50 metres. New foundations would be built beside the existing turbines.
- Size
- 2 proposed turbines · 800 kW each turbine rating · 76.5 metres proposed tip height
- Stage
- Past its target date of 5 May 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes replacing two existing turbines with two new turbines rated at 800kW each, with new foundations beside the existing turbines. The new turbines would have a tip height of 76.5 metres and a hub height of 50 metres. The existing turbines were permitted under application APP/2011/3257; existing infrastructure would be used. The application is awaiting a decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/APP/2026/0348?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/APP/2026/0348. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Two turbines would replace the existing turbines. Their tip height would increase from 45.5 metres to 76.5 metres.
- 02
The proposed hub height is 50 metres, compared with 32 metres for the existing turbines.
- 03
New foundations and associated infrastructure works are proposed beside the existing turbines.
Questions
What earlier application is linked to this proposal?
The existing turbines were permitted under application APP/2011/3257.
Was there pre-application contact with the council?
The form records a response to pre-application enquiry ENQ/2025/1524.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 2
What each tag is based on
- Associated Infrastructure
- “Associated Infrastructure”
- Wind Turbine
- “Erection of 2 Wind Turbines”
- Wind Turbine Count 2
- “2 Wind Turbines”
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received3 Mar 2026
- Validated5 Mar 2026The council has everything it needs.
- Comments closed26 Mar 2026Usual deadline. Late comments may still count.
- Target decision (next)5 May 20262-month target for local developments.
- DecisionNot yet
Planning terms
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- ABS/APP/2026/0348
- Address
- Auchorrie Farm Midmar Aberdeenshire AB51 7NL
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Westhill and District
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.





