Planning applicationABS/APP/2026/0348

Auchorrie Farm Midmar Aberdeenshire AB51 7NL

Awaiting decisionWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

3 March 2026

Validated

5 March 2026

Planning Signals

3 detected traits

Specific
Associated InfrastructureWind TurbineWind Turbine Count 2
Application Insights

No form insights available yet.

AI summary

Plans for two wind turbines with 50m hub height, reaching 76.5m, plus associated infrastructure, access and grid/laydown works.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/APP/2026/0348

Auchorrie Farm Midmar Aberdeenshire AB51 7NL

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Plans for two wind turbines with 50m hub height, reaching 76.5m, plus associated infrastructure, access and grid/laydown works.

Reference
ABS/APP/2026/0348
Address
Auchorrie Farm Midmar Aberdeenshire AB51 7NL
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.142505
Longitude
-2.539192

Plain-language summary

Plans for two wind turbines with 50m hub height, reaching 76.5m, plus associated infrastructure, access and grid/laydown works.

As filed with the council

Erection of 2 Wind Turbines (Hub Height 50 metres) Total Height 76.5 metres) and Associated Infrastructure