Planning applicationABS/APP/2026/0430

Ednie Farms St Fergus Peterhead

Awaiting decisionWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

13 March 2026

Validated

18 March 2026

Planning Signals

3 detected traits

Specific
Condition Non Compliance GeneralWind TurbineWind Turbine Count 2
Application Insights

No form insights available yet.

AI summary

Plans to amend conditions for two 800kW wind turbines (up to ~79.6m), extending operational life and end-of-lifespan arrangements.

Impact scale

Estimated scale of impact on the surrounding area.

4/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/APP/2026/0430

Ednie Farms St Fergus Peterhead

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Plans to amend conditions for two 800kW wind turbines (up to ~79.6m), extending operational life and end-of-lifespan arrangements.

Reference
ABS/APP/2026/0430
Address
Ednie Farms St Fergus Peterhead
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
4/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.5534
Longitude
-1.8551

Plain-language summary

Plans to amend conditions for two 800kW wind turbines (up to ~79.6m), extending operational life and end-of-lifespan arrangements.

As filed with the council

Erection of 2 X 800 KW Wind Turbines 79.6m High and Associated Infrastructure Without Compliance With Condition 20 (Operational Life) and 21 (End of Lifespan) of Planning Permission Reference APP/2009/3637