Planning applicationABS/APP/2026/0965

Craigneil Windfarm Land To The North And North East Of Hillside Rickarton Stonehaven

Awaiting decisionWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

4 June 2026

Validated

4 June 2026

Planning Signals

11 detected traits

Specific
Borrow PitCivil WorksMet MastRail InfrastructureRailway InfrastructureRailway Station
Application Insights

No form insights available yet.

AI summary

Wind farm variation: up to 11 turbines with access tracks, substation/control building, met mast and temporary construction compound; micro-siting changes.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/APP/2026/0965

Craigneil Windfarm Land To The North And North East Of Hillside Rickarton Stonehaven

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Wind farm variation: up to 11 turbines with access tracks, substation/control building, met mast and temporary construction compound; micro-siting changes.

Reference
ABS/APP/2026/0965
Address
Craigneil Windfarm Land To The North And North East Of Hillside Rickarton Stonehaven
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.0066
Longitude
-2.3368

Plain-language summary

Wind farm variation: up to 11 turbines with access tracks, substation/control building, met mast and temporary construction compound; micro-siting changes.

As filed with the council

Erection of 11 Wind Turbines, Formation of Access Tracks, Hardstandings, Substation, Control Building, Met Mast, Borrow Pit, Associated Infrastructure and Temporary Construction Compound Without Compliance with Conditions 5 (Implementation in Accordance with Approved Plans), 6 (Design and Operation of Turbines) and 18 (Micro-siting) of Planning Permission APP/2018/0993