Planning applicationABS/APP/2026/1677

Land At Mahon Farm Turriff AB53 4HD

Awaiting decisionWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

6 October 2026

Validated

8 October 2026

Planning Signals

3 detected traits

Specific
Associated WorksWind TurbineWind Turbine Count 2
Application Insights

No form insights available yet.

AI summary

Replacement of two existing wind turbines with two V29 turbines (44.5m tip height) and associated ancillary works.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/APP/2026/1677

Land At Mahon Farm Turriff AB53 4HD

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Replacement of two existing wind turbines with two V29 turbines (44.5m tip height) and associated ancillary works.

Reference
ABS/APP/2026/1677
Address
Land At Mahon Farm Turriff AB53 4HD
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
6/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.534494
Longitude
-2.48516

Plain-language summary

Replacement of two existing wind turbines with two V29 turbines (44.5m tip height) and associated ancillary works.

As filed with the council

Replacement of 2 Existing Wind Turbines with 2 V29 Wind Turbines (Tip Height 44.5m) and Associated Ancillary Works