1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

12 October 2026

Validated

12 October 2026

Planning Signals

6 detected traits

Specific
Condition Non Compliance GeneralOffshore Wind FarmPlanning Permission Time ExtensionSection 42 VariationSubstationUnderground Cable Route Works
Application Insights

No form insights available yet.

AI summary

Application to vary a condition on a previous permission to extend the duration, covering an onshore landfall point, underground cable and substation.

Impact scale

Estimated scale of impact on the surrounding area.

1/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/APP/2026/1706

Land From North Of Peterhead To South Of New Deer Green Volt Offshore Windfarm Aberdeenshire

Awaiting decisionLegal / AdministrativeReceived Aberdeenshire Council

Application to vary a condition on a previous permission to extend the duration, covering an onshore landfall point, underground cable and substation.

Reference
ABS/APP/2026/1706
Address
Land From North Of Peterhead To South Of New Deer Green Volt Offshore Windfarm Aberdeenshire
Status
Awaiting decision
Category
Legal / Administrative
Impact scale
1/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.50812299999999
Longitude
-1.784066

Plain-language summary

Application to vary a condition on a previous permission to extend the duration, covering an onshore landfall point, underground cable and substation.

As filed with the council

National for Formation of Onshore Landfall Point, Laying of Underground Cable and Erection of Substation Without Compliance With Condition Deemed By S58(2) Of The Town And Country Planning (Scotland) Act 1997 of Planning Permission APP/2023/1454 (Duration of Permission)