CityScope · Planning Updates
Application ABS/ENQ/2025/1386
Land At Netherton Fisherford Rothienorman Aberdeenshire
Proposed 77m wind turbine with substation and access track, as well as associated infrastructure.
The record
- Reference
- ABS/ENQ/2025/1386
- Address
- Land At Netherton Fisherford Rothienorman Aberdeenshire
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.4192
- Longitude
- -2.5451
What is proposed
Plain-language summary
Proposed 77m wind turbine with substation and access track, as well as associated infrastructure.
As filed with the council
Erection of Wind Turbine (Height to Blade Tip 77m) and Associated Infrastructure, Including Substation and Access Track (Renewal of APP/2020/0293)