Planning applicationABS/ENQ/2026/0115

Foudland Hill Wind Farm Insch Aberdeenshire

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

23 January 2026

Validated

23 January 2026

Planning Signals

4 detected traits

Specific
Eia ScopingSection 36 ConsentWind Farm Micro Siting VariationWind Turbine
AI summary

Scoping consultation for up to nine wind turbines (to 200m), 20MW BESS and associated infrastructure, totalling 84.4MW capacity.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/ENQ/2026/0115

Foudland Hill Wind Farm Insch Aberdeenshire

DecidedRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Scoping consultation for up to nine wind turbines (to 200m), 20MW BESS and associated infrastructure, totalling 84.4MW capacity.

Reference
ABS/ENQ/2026/0115
Address
Foudland Hill Wind Farm Insch Aberdeenshire
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.385
Longitude
-2.6654

Plain-language summary

Scoping consultation for up to nine wind turbines (to 200m), 20MW BESS and associated infrastructure, totalling 84.4MW capacity.

As filed with the council

Proposed Section 36 Consent Scoping Consultation for Erection of 9 Wind Turbines (up to 200m to blade tip), 20MW BESS and Associated Infrastructure (Development Total Capacity 84.4MW)