Planning applicationABS/ENQ/2026/0737

Peterhead To Kintore Overhead Line (OHL)

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

29 April 2026

Validated

14 May 2026

Planning Signals

4 detected traits

Specific
Eia ScopingOverhead Utility LinesSection 37 ConsentSubstation
AI summary

Scoping for reconductoring and voltage upgrades of existing overhead lines between Peterhead, Kintore and Persley, for higher-capacity grid operation.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/ENQ/2026/0737

Peterhead To Kintore Overhead Line (OHL)

DecidedRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Scoping for reconductoring and voltage upgrades of existing overhead lines between Peterhead, Kintore and Persley, for higher-capacity grid operation.

Reference
ABS/ENQ/2026/0737
Address
Peterhead To Kintore Overhead Line (OHL)
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
7/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.5045
Longitude
-1.7879

Plain-language summary

Scoping for reconductoring and voltage upgrades of existing overhead lines between Peterhead, Kintore and Persley, for higher-capacity grid operation.

As filed with the council

Proposed Section 37 Consent Scoping Consultation for Reconductoring of Approximately 51 Kilometres (KM) of an Existing 275 Kilovolt (KV) Overhead LINE (OHL), Connecting Substations Between Peterhead and Kintore to Enable Operation at 400 KV, and Approximately 12 KM of Existing 132 KV OHL Connecting the Existing Persley Tee to Persley Substation to Enable Operation at 275 KV