Planning applicationABS/ENQ/2026/0781

Ednie Farms St Fergus Peterhead

DecidedWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

8 May 2026

Validated

8 May 2026

Planning Signals

4 detected traits

Specific
Associated InfrastructureCondition Non Compliance GeneralWind TurbineWind Turbine Count 2
AI summary

Erection of two wind turbines (around 80m high) with associated infrastructure, with proposed changes to operational and end-of-life conditions.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/ENQ/2026/0781

Ednie Farms St Fergus Peterhead

DecidedRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Erection of two wind turbines (around 80m high) with associated infrastructure, with proposed changes to operational and end-of-life conditions.

Reference
ABS/ENQ/2026/0781
Address
Ednie Farms St Fergus Peterhead
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.5534
Longitude
-1.8551

Plain-language summary

Erection of two wind turbines (around 80m high) with associated infrastructure, with proposed changes to operational and end-of-life conditions.

As filed with the council

Erection of 2 X 800 KW Wind Turbines 79.6m High and Associated Infrastructure Without Compliance With Condition 20 (Operational Life) and 21 (End of Lifespan) of Planning Permission Reference APP/2009/3637