Application ABS/ENQ/2026/0781
Ednie Farms St Fergus Peterhead
Erection of two wind turbines (around 80m high) with associated infrastructure, with proposed changes to operational and end-of-life conditions.
The record
- Reference
- ABS/ENQ/2026/0781
- Address
- Ednie Farms St Fergus Peterhead
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Aberdeenshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 57.5534
- Longitude
- -1.8551
What is proposed
Plain-language summary
Erection of two wind turbines (around 80m high) with associated infrastructure, with proposed changes to operational and end-of-life conditions.
As filed with the council
Erection of 2 X 800 KW Wind Turbines 79.6m High and Associated Infrastructure Without Compliance With Condition 20 (Operational Life) and 21 (End of Lifespan) of Planning Permission Reference APP/2009/3637