Planning application · ABS/ENQ/2026/0800
Two wind turbines proposed at Brigstanes Farm.
Land At Brigstanes Farm Catterline Stonehaven Aberdeenshire AB39 2UA
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Access Roads
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 2
Overview
Why it’s worth watching
Two 69m wind turbines with access track represent a material renewable energy development with local landscape and access implications.
- Proposed
- Two wind turbines, an access track and associated infrastructure
- Size
- 2 wind turbines · 45 m height to hub · 69 m height to blade tip
- Stage
- Decided on 10 Jun 2026: EIA Opinion Adopted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes two wind turbines at land at Brigstanes Farm, with an access track and associated infrastructure. The turbines are described as 45m to the hub and 69m to the blade tip. The record says an environmental impact assessment (EIA) opinion was adopted; it does not give a planning permission decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.
Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ABS/ENQ/2026/0800?
Follow it on City Scope. This page is checked against the Aberdeenshire Council planning register and shows the latest status, decision and documents for ABS/ENQ/2026/0800. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Aberdeenshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Two wind turbines are proposed, with a height of 69m to the blade tip.
- 02
An access track and associated infrastructure are proposed; the record does not give further details.
Questions
Does the record say the turbines have planning permission?
No. It records that an EIA opinion was adopted, but does not give a planning permission decision.
Tags
- Access Roads
- Associated Infrastructure
- Wind Turbine
- Wind Turbine Count 2
What each tag is based on
- Access Roads
- “Formation of Access Track”
- Associated Infrastructure
- “and Associated Infrastructure”
- Wind Turbine
- “Erection of 2 Wind Turbines”
- Wind Turbine Count 2
- “Erection of 2 Wind Turbines”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 10 June 2026.
- Received13 May 2026
- Validated13 May 2026The council has everything it needs.
- Comments closed3 Jun 2026Usual deadline. Late comments may still count.
- Target decision13 Jul 20262-month target for local developments.
- Decision10 Jun 2026EIA Opinion Adopted.
The record
- Reference
- ABS/ENQ/2026/0800
- Address
- Land At Brigstanes Farm Catterline Stonehaven Aberdeenshire AB39 2UA
- Status
- Decided
- Council decision
- EIA Opinion Adopted
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Aberdeenshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Mearns
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.