Planning applicationABS/ENQ/2026/1860

Land At Cairnadailly Farm Ellon

Awaiting decisionRenewable Energy & Sustainability
Official records · coverage in progress

1,742 of 1,898 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 156 records from that period are still being added or checked.

Proposals and decisions come from Aberdeenshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

9 October 2026

Validated

9 October 2026

Planning Signals

4 detected traits

Specific
Access RoadsAssociated InfrastructureSubstationWind Turbine Count 1
AI summary

Erection of wind turbine (hub height 61.31m, tip 99.91m) with substation and access track.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ABS/ENQ/2026/1860

Land At Cairnadailly Farm Ellon

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Aberdeenshire Council

Erection of wind turbine (hub height 61.31m, tip 99.91m) with substation and access track.

Reference
ABS/ENQ/2026/1860
Address
Land At Cairnadailly Farm Ellon
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Aberdeenshire Council
Received
Validated
Last scraped
Record created
Latitude
57.364597
Longitude
-2.072972

Plain-language summary

Erection of wind turbine (hub height 61.31m, tip 99.91m) with substation and access track.

As filed with the council

Erection of Wind Turbine (Hub Height 61.31m, 99.91m to Blade Tip) and Associated Infrastructure, Including Substation and Access Track