Planning applicationAGB/25/01074/PP

Scottish Sea Farms Ltd Barcaldine Argyll And Bute PA37 1SE

DecidedNew-Build & Major Development
Official records · coverage in progress

1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.

Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

26 June 2025

Validated

7 July 2025

Planning Signals

5 detected traits

Specific
Aquaculture HatcheryConstruction Programme VariationDrainage Wastewater InfrastructureSection 42 VariationWater Pumping Station
Application Insights

No form insights available yet.

AI summary

Section 42 seeks more time to start a post smolt seawater RAS facility, with water/waste treatment buildings and a separate pumping station.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application AGB/25/01074/PP

Scottish Sea Farms Ltd Barcaldine Argyll And Bute PA37 1SE

DecidedNew-Build & Major DevelopmentReceived Argyll and Bute Council

Section 42 seeks more time to start a post smolt seawater RAS facility, with water/waste treatment buildings and a separate pumping station.

Reference
AGB/25/01074/PP
Address
Scottish Sea Farms Ltd Barcaldine Argyll And Bute PA37 1SE
Status
Decided
Category
New-Build & Major Development
Impact scale
6/10
Authority
Argyll and Bute Council
Received
Validated
Last scraped
Record created
Latitude
56.513916
Longitude
-5.354751

Plain-language summary

Section 42 seeks more time to start a post smolt seawater RAS facility, with water/waste treatment buildings and a separate pumping station.

As filed with the council

Section 42 application to planning permission reference 21/02609/PP (Erection of post smolt seawater re-circulating aquaculture system (RAS) unit with ancillary building with water treatment, waste treatment, PH Regulation and workshop; separate seawater pumping station) to vary the standard time limit condition to permit a further 3 year time limit within which to commence the development