CityScope · Planning Updates
Application AGB/25/01342/S36
Giant's Burn Wind Farm 1.3km North West Of Dunoon And 1.5km South West Of Sandbank Argyll And Bute
Proposed Giants Burn Wind Farm: up to seven 3-bladed turbines (blade tips to around 200m) plus battery energy storage, for a 50-year operational period.
The record
- Reference
- AGB/25/01342/S36
- Address
- Giant's Burn Wind Farm 1.3km North West Of Dunoon And 1.5km South West Of Sandbank Argyll And Bute
- Status
- Unknown
- Council decision
- Objection
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Argyll and Bute Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 55.9623
- Longitude
- -4.9894
What is proposed
Plain-language summary
Proposed Giants Burn Wind Farm: up to seven 3-bladed turbines (blade tips to around 200m) plus battery energy storage, for a 50-year operational period.
As filed with the council
Section 36 Consultation: Giant's Burn Wind Farm (ECU ref. ECU00005007) for the erection of 7 variable pitch (3 bladed) wind turbines (5 each with a maximum blade tip height of up to 200m and 2 up to 180m) along with a battery energy storage system (BESS). The application seeks an operational period of 50 years.
