Planning applicationAGB/25/01342/S36

Giant's Burn Wind Farm 1.3km North West Of Dunoon And 1.5km South West Of Sandbank Argyll And Bute

UnknownWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.

Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

25 July 2025

Validated

25 July 2025

Council decision
Objection
Decision issued

Planning Signals

2 detected traits

Specific
Section 36 ConsentWind Turbine
Application Insights

No form insights available yet.

AI summary

Proposed Giants Burn Wind Farm: up to seven 3-bladed turbines (blade tips to around 200m) plus battery energy storage, for a 50-year operational period.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application AGB/25/01342/S36

Giant's Burn Wind Farm 1.3km North West Of Dunoon And 1.5km South West Of Sandbank Argyll And Bute

UnknownRenewable Energy, EV & Heat PumpsReceived Argyll and Bute Council

Proposed Giants Burn Wind Farm: up to seven 3-bladed turbines (blade tips to around 200m) plus battery energy storage, for a 50-year operational period.

Reference
AGB/25/01342/S36
Address
Giant's Burn Wind Farm 1.3km North West Of Dunoon And 1.5km South West Of Sandbank Argyll And Bute
Status
Unknown
Council decision
Objection
Decision issued
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
Argyll and Bute Council
Received
Validated
Last scraped
Record created
Latitude
55.9623
Longitude
-4.9894

Plain-language summary

Proposed Giants Burn Wind Farm: up to seven 3-bladed turbines (blade tips to around 200m) plus battery energy storage, for a 50-year operational period.

As filed with the council

Section 36 Consultation: Giant's Burn Wind Farm (ECU ref. ECU00005007) for the erection of 7 variable pitch (3 bladed) wind turbines (5 each with a maximum blade tip height of up to 200m and 2 up to 180m) along with a battery energy storage system (BESS). The application seeks an operational period of 50 years.