Planning application · AGB/25/01709/SCREEN
33kV overhead line to Clachaig Glen windfarm in screening application.
Clachaig Glen Windfarm Land North East Of Muasdale Argyll and Bute
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Medium 6/10
- Eia Screening
- Kilovolt Voltage Category 33kv Overhead Line
- Overhead Line Double Circuit Schedule 8
- Overhead Utility Lines
- Substation Connection Works
Overview
Why it’s worth watching
A proposed 33kV overhead line connecting a substation to a windfarm is a material piece of energy infrastructure with clear local consequence.
- Proposed
- A 33kV dual-circuit overhead line from Carradale substation to Clachaig Glen windfarm
- Size
- 33 kV line voltage
- Stage
- Decided on 18 Feb 2026: Opinion Issued.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks a screening opinion for a proposed 33kV dual-circuit overhead line from Carradale substation to Clachaig Glen windfarm. A screening opinion is the council’s view on whether an environmental impact assessment is required. The record says an opinion was issued, but does not give its conclusion.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.
Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application AGB/25/01709/SCREEN?
Follow it on City Scope. This page is checked against the Argyll and Bute Council planning register and shows the latest status, decision and documents for AGB/25/01709/SCREEN. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Argyll and Bute Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A dual-circuit overhead line is proposed between Carradale substation and Clachaig Glen windfarm; the route details are not given.
Tags
- Eia Screening
- Kilovolt Voltage Category 33kv Overhead Line
- Overhead Line Double Circuit Schedule 8
- Overhead Utility Lines
- Substation Connection Works
- Wind Turbine
What each tag is based on
- Eia Screening
- “Screening opinion for the proposed”, “EIA screening for the proposed”
- Kilovolt Voltage Category 33kv Overhead Line
- “33kV dual circuit overhead line”, “33kV dual overhead power line”
- Overhead Line Double Circuit Schedule 8
- “dual circuit overhead line”
- Overhead Utility Lines
- “dual circuit overhead line”, “overhead power line”
- Substation Connection Works
- “from Carradale substation”
- Wind Turbine
- “Clachaig Glen windfarm”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 18 February 2026.
- Received13 Oct 2025
- Validated13 Oct 2025The council has everything it needs.
- Comments closed3 Nov 2025Usual deadline. Late comments may still count.
- Target decision13 Dec 20252-month target for local developments.
- Decision18 Feb 2026Opinion Issued.
The record
- Reference
- AGB/25/01709/SCREEN
- Address
- Clachaig Glen Windfarm Land North East Of Muasdale Argyll And Bute
- Status
- Unknown
- Council decision
- Opinion Issued
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 6/10
- Authority
- Argyll and Bute Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.