Planning applicationAGB/25/01709/SCREEN

Clachaig Glen Windfarm Land North East Of Muasdale Argyll And Bute

UnknownWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.

Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

13 October 2025

Validated

13 October 2025

Planning Signals

6 detected traits

Specific
Eia ScreeningKilovolt Voltage Category 33kv Overhead LineOverhead Line Double Circuit Schedule 8Overhead Utility LinesSubstation Connection WorksWind Turbine
AI summary

EIA screening for a 33kV dual overhead power line linking Carradale substation to the Clachaig Glen windfarm, mostly along an existing corridor.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application AGB/25/01709/SCREEN

Clachaig Glen Windfarm Land North East Of Muasdale Argyll And Bute

UnknownRenewable Energy, EV & Heat PumpsReceived Argyll and Bute Council

EIA screening for a 33kV dual overhead power line linking Carradale substation to the Clachaig Glen windfarm, mostly along an existing corridor.

Reference
AGB/25/01709/SCREEN
Address
Clachaig Glen Windfarm Land North East Of Muasdale Argyll And Bute
Status
Unknown
Category
Renewable Energy, EV & Heat Pumps
Impact scale
6/10
Authority
Argyll and Bute Council
Received
Validated
Last scraped
Record created
Latitude
55.6272
Longitude
-5.5728

Plain-language summary

EIA screening for a 33kV dual overhead power line linking Carradale substation to the Clachaig Glen windfarm, mostly along an existing corridor.

As filed with the council

Screening opinion for the proposed 33kV duel circuit overhead line from Carradale substation to Clachaig Glen windfarm