Planning applicationAGB/25/01725/NMA

Clamshell Cave Staffa Argyll And Bute

DecidedPublic Realm & Community Projects
Official records · coverage in progress

1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.

Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

15 October 2025

Validated

15 October 2025

Planning Signals

4 detected traits

Specific
Access EquipmentAccessibilityMarine InfrastructureNon Material Variation
AI summary

Amendment to existing Staffa jetty staircase: new stairs, visitor platform, updated handrails and safer access using lighter steel/GRP.

Impact scale

Estimated scale of impact on the surrounding area.

4/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application AGB/25/01725/NMA

Clamshell Cave Staffa Argyll And Bute

DecidedPublic Realm & Community ProjectsReceived Argyll and Bute Council

Amendment to existing Staffa jetty staircase: new stairs, visitor platform, updated handrails and safer access using lighter steel/GRP.

Reference
AGB/25/01725/NMA
Address
Clamshell Cave Staffa Argyll And Bute
Status
Decided
Category
Public Realm & Community Projects
Impact scale
4/10
Authority
Argyll and Bute Council
Received
Validated
Last scraped
Record created
Latitude
56.4328
Longitude
-6.3392

Plain-language summary

Amendment to existing Staffa jetty staircase: new stairs, visitor platform, updated handrails and safer access using lighter steel/GRP.

As filed with the council

Non Material Amendment relative to Planning Permission 21/01929/PP - Proposed new stairway and replacement handrails, formation of new visitor platform at the top of existing jetty and over previous walkway - Following the completion of the jetty works on the Isle of Staffa, a new team has developed plans for a less complex and less intrusive staircase structure than was originally planned. The original plans included substantial breaking out of the natural rock strata in order to accommodate the stairs which brings significant risks to the stability of the rock. The original plans included steps made of pre-cast concrete set into steel runners and supported on concrete foundations. The revised plans now include a lighter superstructure made of mild steel and Glass Reinforced Plastic (GRP) which is more than sufficiently durable and will be coloured dark grey to blend with the surrounding rock. Concrete foundations will be coloured dark grey and will be supported by hidden dowels drilled into the rock. An advantage of the new plan is that, once installed, the stairs can easily be removed in the future and simply replaced. The location of the stairs has not changed. The positioning of the stairs has been modified very slightly in order to minimise any need for breaking out existing rock. The gradient of the stairs varies but the new plan incorporates a continuous, flowing, single structure with steps all of the same width (900mm). Overall this amendment will greatly improve the accessibility, safety and visual appearance of the existing Staffa staircase.