1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.

Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

23 March 2026

Validated

23 March 2026

Planning Signals

3 detected traits

Works
Windows & Doors
Specific
DistilleryNon Material Variation
AI summary

Non-material amendment to approved distillery/visitor centre plans, with tweaks to stillhouse and maltings layout, added roofed courtyard space and updated openings.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application AGB/26/00523/NMA

Land South And East Of Farkin Cottage Port Ellen Isle Of Islay Argyll And Bute

Awaiting decisionNew-Build & Major DevelopmentReceived Argyll and Bute Council

Non-material amendment to approved distillery/visitor centre plans, with tweaks to stillhouse and maltings layout, added roofed courtyard space and updated openings.

Reference
AGB/26/00523/NMA
Address
Land South And East Of Farkin Cottage Port Ellen Isle Of Islay Argyll And Bute
Status
Awaiting decision
Category
New-Build & Major Development
Impact scale
6/10
Authority
Argyll and Bute Council
Received
Validated
Last scraped
Record created
Latitude
55.6305
Longitude
-6.1732

Plain-language summary

Non-material amendment to approved distillery/visitor centre plans, with tweaks to stillhouse and maltings layout, added roofed courtyard space and updated openings.

As filed with the council

Non Material Amendment relatvie to Planning Permission 19/02555/PP - (Erection of distillery with associated maltings and vaulted maturation warehouse, visitor's centre with shop, restaurant and meeting facilities, tasting lodge and associated infrastructure including: sewage treatment plant and pumping station, new junction, access roads, car parking, tankfarms, SuDS pond, reservoir and sea water intake) - The stillhouse has increased by moving east by 3 meters. The Boiler House size has doubled as other functions added to this. The Maltings length increase by around 8 meters and the Kiln area increase, and this has resulted in a 2 Pagoda design to fit the area rather than the 1 as per planning. The Filling store has increase in length to mirror the malting increase in length. The central courtyard has been infilled with a roof to give an internal function space. Entrance porch area added to Office, Visitor area. Some variations on window , door locations. Other variations detailed on submitted drawings.