Planning applicationAGB/26/00910/NMA

Land South Of Tigh Na Traighe Balinoe Isle Of Tiree Argyll And Bute

Awaiting decisionRenewable Energy & Sustainability
Official records · coverage in progress

1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.

Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

28 May 2026

Validated

29 May 2026

Planning Signals

6 detected traits

Works
Facade / ExteriorInternal Alterations
Specific
AnnexeNon Material VariationPackage Treatment PlantParking Access
AI summary

NM amendment proposals to reposition house & annexe, tweak openings, add red cladding and black solar panels, plus updated access/plant.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application AGB/26/00910/NMA

Land South Of Tigh Na Traighe Balinoe Isle Of Tiree Argyll And Bute

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Argyll and Bute Council

NM amendment proposals to reposition house & annexe, tweak openings, add red cladding and black solar panels, plus updated access/plant.

Reference
AGB/26/00910/NMA
Address
Land South Of Tigh Na Traighe Balinoe Isle Of Tiree Argyll And Bute
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
5/10
Authority
Argyll and Bute Council
Received
Validated
Last scraped
Record created
Latitude
56.4712
Longitude
-6.8991

Plain-language summary

NM amendment proposals to reposition house & annexe, tweak openings, add red cladding and black solar panels, plus updated access/plant.

As filed with the council

Non Material Amendment to Planning Permission 24/00636/PP - (Erection of dwellinghouse and 1 bedroom annexe, installation of package treatment plant and formation of vehicular access) Repositioning of house and annexe on site. Changes to several openings due to alterations to internal layout. Introduction of red timber cladding to House gable walls, colour to match red aluminium roof cladding. INtroduction of 12 no. flush fitted black solar panels to annexe roof.