Planning application · AGB/26/01752/S36
Six wind turbines up to 200 metres proposed at Cruach Clenamacrie.
Cruach Clenamacrie Wind Farm Glenlonan Oban Argyll and Bute
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Major 9/10
- Associated Infrastructure
- Battery Storage
- Section 36 Consent
Overview
Why it’s worth watching
This is a major energy development with six 200m turbines and battery storage in the Glenlonan area near Oban, with substantial landscape and infrastructure implications.
- Proposed
- Six wind turbines, associated infrastructure, a battery energy storage system and a compound.
- Size
- 6 wind turbines · 200 metres maximum height
- Stage
- Decided on 12 Nov 2026: LPA response to Notif. - Comments.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is a Section 36 consultation about additional information for a proposal to build and operate six wind turbines. Their maximum height from the ground to the blade tip would be 200 metres. The proposal also includes associated infrastructure, a battery energy storage system and a compound. The council is awaiting a decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,438 of 1,612 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 174 records from that period are still being added or checked.
Proposals and decisions come from Argyll and Bute Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application AGB/26/01752/S36?
Follow it on City Scope. This page is checked against the Argyll and Bute Council planning register and shows the latest status, decision and documents for AGB/26/01752/S36. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Argyll and Bute Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Six wind turbines would be built and operated at the site.
- 02
The turbines would reach 200 metres from the ground to the blade tip.
- 03
A battery energy storage system and compound are included in the proposal.
Questions
What does the Section 36 consultation concern?
It concerns additional information for the Cruach Clenamacrie Wind Farm proposal. The record gives the ECU reference as ECU00004841.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Battery Storage
- Section 36 Consent
What each tag is based on
- Associated Infrastructure
- “associated infrastructure”
- Battery Storage
- “Battery Energy Storage System and compound (BESS)”
- Section 36 Consent
- “Section 36 consultation: Cruach Clenamacrie Wind Farm”
As lodged
The drawings.




All documents (4)
- General Supporting Documentation - Public - Additional Information - Fig 3.1, 3.1a & 3.1b - Grid Route Constraints Overview and Block Plans
- General Supporting Documentation - Public - Additional Information - Volume 2 - Figures and Visualisations Contents Page
- General Supporting Documentation - Public - Additional Information - Figure 2.1, 2.1a & 2.1b - Grid Route Overview and Block Plans
- General Supporting Documentation - Public - Additional Information - Fig 3.1, 3.1a & 3.1b - Grid Route Constraints Overview and Block Plans
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 12 November 2026.
- Received30 Sept 2026
- Validated30 Sept 2026The council has everything it needs.
- Comments closed21 Oct 2026Usual deadline. Late comments may still count.
- Target decision30 Jan 20274-month target for major developments.
- Decision12 Nov 2026LPA response to Notif. - Comments.
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
The record
- Reference
- AGB/26/01752/S36
- Address
- Cruach Clenamacrie Wind Farm Glenlonan Oban Argyll And Bute
- Status
- Unknown
- Council decision
- LPA response to Notif. - Comments
- Decision issued
- Category
- New-Build & Major Development
- Impact scale
- 9/10
- Authority
- Argyll and Bute Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.