Planning application · ANG/25/00454/S36
7-turbine floating wind farm proposed 35 Kilometers off Peterhead.
Salamander Wind Farm, 35 Kilometers Off The Coast Of Peterhead
Free with a City Scope account. One email, when the council decides.
Also email me new applications in this council · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Offshore Wind Farm
- Section 36 Consent
- Wind Turbine
Overview
Why it’s worth watching
This is a Section 36 consent consultation for the Salamander floating offshore wind farm, comprising 7 turbines up to 310 m, located 35 km off Peterhead, which received no objection.
- Proposed
- A floating offshore wind farm with 7 wind turbines and associated transmission assets.
- Size
- 7 wind turbines · 310 m maximum turbine height
- Stage
- Past its target date of 18 Oct 2025.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is to construct and operate a floating offshore wind farm with 7 wind turbines and associated transmission assets. The turbines would have a maximum height of 310 m.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
438 of 559 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 121 records from that period are still being added or checked.
Proposals and decisions come from Angus Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ANG/25/00454/S36?
Follow it on City Scope. This page is checked against the Angus Council planning register and shows the latest status, decision and documents for ANG/25/00454/S36. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Angus Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The wind farm would be 35 Kilometers off the coast of Peterhead.
- 02
The turbines would have a maximum height of 310 m.
- 03
Associated transmission assets are proposed; their location is not specified in the description.
- 04
Construction and operation of the wind farm are proposed.
Tags
- Offshore Wind Farm
- Section 36 Consent
- Wind Turbine
What each tag is based on
- Offshore Wind Farm
- “floating offshore wind farm”
- Section 36 Consent
- “25/00454/S36”
- Wind Turbine
- “comprising 7 wind turbines”
All documents (4)
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received18 Aug 2025
- Validated18 Aug 2025The council has everything it needs.
- Comments closed8 Sept 2025Usual deadline. Late comments may still count.
- Target decision (next)18 Oct 20252-month target for local developments.
- DecisionNot yet
The record
- Reference
- ANG/25/00454/S36
- Address
- Salamander Wind Farm, 35 Kilometers Off The Coast Of Peterhead
- Status
- No Objection
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Angus Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







